Overall Scope:
Spike holes into the existing compressed macadam and where required make drainage channels back filled with shingle to aid with surface water removal. Excavate as required and back fill pits across the surface to ensure accurate levels. Chase the perimeter of the area to allow for the new macadam surface to finish flush with the existing kerbs. Supply and lay a new open textured macadam surface using 6mm Supersoft specifically designed for use on sports courts.
Programme Start: 12.8.20
Programme: 4 weeks
Project Details
Polymeric Playground Resurface